Prestiges Projects

Chelsea Barracks - The Penthouse

About This Project

Project Timeline - 3 Days

Colour - Coat - Gumption

Koolcreations was commissioned to completely transform this already stunning kitchen, situated within one of Chelsea's most prestigious residential properties. Working alongside an active renovation project, our team carefully completed the transformation over a three-day period with meticulous attention to detail.


The project involved our specialist kitchen spraying process, delivering a flawless factory-quality finish, alongside the intricate detailing of each cabinet's inner trim to create a truly refined result. Every stage of the project was carried out with precision and care, ensuring a luxury finish that complements the exceptional standard of the property.

The Main Kitchen


The complete project took 3 days in total and was sprayed using the industry leading Renner paint system. Our in-depth preparation process was required to insure the laminate sections was ready for the primer application.

Put your best foot FORward

The Island

The priming stage consisted of multiple primer applications, with an intensive sanding process once dried. This insured the laminate was smooth and completely sealed for the top coat application.

The Main Kitchen


With the priming phase complete, the team then proceeded to apply two top coats (colour coat), allowing each coat to dry before applying the next.


The Result...

Put your best foot FORward

The Detailing


Once our preparation and spraying process was complete, we moved on to the detailing stage. This meticulous process involved carefully masking each individual door before using a specialist aerosol system to apply a light, even coating to the inner trim.



Although time-intensive, this additional level of craftsmanship elevates the overall finish, creating a seamless, factory-quality appearance and bringing this stunning kitchen transformation to perfection.